Tender Preparation:
Our professional team will prepare tender documents that will fit your needs, your expectations, and your requirements, and will make sure that the terms and conditions are adequate to protect the owner from any consequences of ambiguity or omissions. And will make sure that adequate guarantees are submitted by the contractors.
In addition to that, the method of measurement is usually one of the main issues and reasons of dispute between the owners and the Contractors. Accordingly our team will make sure that the standard Engineering Method of Measurement will be applied in these contracts and will be clear that the traditional method of measurements will not be used in any of our projects.
On the other hand, our team will make sure that the Bill of Quantity includes a pay item for each activity that usually is subject to dispute to be fair with the contractors and to protect the owners from the greediness of some contractors.
The packaging strategy to minimize the costs on the owners will require extensive coordination activities that requires the presence of all concerned contractors from the commencement of the project, and will add huge responsibility on the supervision team and management team. Therefore the tender documents should describe clearly the responsibility of each contractor regarding any coordination issues that may be exposed at a later stage. In addition to that, the design drawings should be detailed so that they will be used for construction.